clanak False

The new Sljeme Ropeway

07.11.2019.
The new Sljeme Ropeway will replace the old ropeway and is considered to be one of the city’s major projects. Its main purpose is public transport from the bottom stop Dolje all the way up to the top of the Sljeme Peak. The new ropeway is being built where the old one once was and will have 84 gondolas, each holding up to 10 passengers. The entire lift should take 16 minutes from bottom to top.